Skip to content

Libya

Zumurrud Shopping Mall

Tripoli, Libya

Zumurrud Shopping Mall

Project Description

TERMA is currently performing the engineering, mechanical shop drawings, installation, testing, and commissioning of HVAC, plumbing, fire protection, and building automation systems for Zumurrud Shopping Mall in Tripoli, Libya. The project is being executed in accordance with project specifications, applicable international codes and standards, and quality assurance requirements to support the delivery of a modern retail destination.

Scope of Work

  • HVAC Systems
  • Plumbing Systems
  • Fire Protection Systems
  • Building Automation Systems (BAS)
  • Mechanical Shop Drawings
  • Mechanical & Plumbing Installation
  • Testing & Commissioning

Applicable Codes & Standards

  • NFPA Standards
  • ASHRAE Standards and Guidelines
  • SMACNA HVAC Duct Construction Standards
  • International Building Code (IBC)
  • International Mechanical Code (IMC)
  • International Plumbing Code (IPC)
  • International Fire Code (IFC)
  • UL and FM Approval Requirements
  • Applicable Local Authority Requirements

Have a project in mind?

Share the building, the systems and your timeline. Our engineers will prepare a mechanical proposal.